Environmental procedures manual gdot






















Environmental Role in the Plan Development Process. Programming and Scheduling Activities. Concept Stage Activities. Review the Environmental Survey Boundary. Conduct Early Coordination. Practicable Alternatives Review. Concept Meeting. Concept Report Development. Concept report Approval. GDOT Environmental Procedures Manual [2] 2/13/12 CHAPTER I – INTRODUCTION Purpose Environmental analysis is part of determining how a project should be developed – environmental impacts are factored into the decisions made. The overarching law for federal-aid projects, the NationalFile Size: 2MB.  · prepared in accordance with the Environmental Procedures Manual. EER Procedure 1. During preparation of an EER, GDOT or its agent will consult with and solicit comments from agencies/parties which have jurisdiction by law, special expertise, or other interest with respect to environmental impact (where applicable and when consultation wasn’t completed during the File Size: KB.


The Design Plan required environmental reports, topographic and boundary surveys, as well as a horizontal and vertical design to AASHTO requirements. The following GDOT processes and manuals were used on this project: GDOT Plan Development Process, Design Policy Manual, Environmental Procedures Manual, Driveway Encroachment Manual. Environmental Procedures Manual. will include design consideration for fish passage in accordance with the USACE Regional Conditions and the GDOT's Fish Passage Requirements posted on the ROADS webpage. Once plans with delineations are available, the Phase Two Report will address impacts to each river or stream within project required ROW. Environmental Role in the Plan Development Process. Programming and Scheduling Activities. Concept Stage Activities. Review the Environmental Survey Boundary. Conduct Early Coordination. Practicable Alternatives Review. Concept Meeting. Concept Report Development. Concept report Approval.


GDOT Environmental Procedures Manual [2] 2/13/12 CHAPTER I – INTRODUCTION Purpose Environmental analysis is part of determining how a project should be developed – environmental impacts are factored into the decisions made. The overarching law for federal-aid projects, the National. prepared in accordance with the Environmental Procedures Manual. EER Procedure 1. During preparation of an EER, GDOT or its agent will consult with and solicit comments from agencies/parties which have jurisdiction by law, special expertise, or other interest with respect to environmental impact (where applicable and when consultation wasn’t completed during the environmental evaluation). Environmental Role in the Plan Development Process. Programming and Scheduling Activities. Concept Stage Activities. Review the Environmental Survey Boundary. Conduct Early Coordination. Practicable Alternatives Review. Concept Meeting. Concept Report Development. Concept report Approval.

0コメント

  • 1000 / 1000